Call us at +1 (604) 655 4200 or in the USA at +1(206)260 0266
Open
X

Damper Performance Testing – Golden Ears Bridge, Vancouver.

Damper Performance Testing – Golden Ears Bridge, Vancouver

Civionic Engineering and Consulting (2014) Inc. has been contracted to assess the condition of the viscous dampers at the Golden Ears Bridge, located in British Columbia, Canada. The objective of the scope of work was to determine the physical performance of the damping systems to maintain service live of the stay cables during and after the concession period.